(29)
Switch
Where it is first named
buildup; whereas the switch 29 is a gas pressure switch to
How it is written
- (switch 29) 3×
Drawings 2
-
Page 12 · Hydrogen Aeration Injection System
-
22 shutting down the entire system for safety inspection. · Hydrogen Aeration Injection System
Where it is named · 3
Hydrogen Aeration Injection System 3×
-
switch (switch 29)
ll i through pressure switch 29. As the electrical power activates 12 | electric solenoid 86, hydrogen gas is caused to pass through
-
switch (switch 29)
13 | flow adjustment valve 53 and then outlet pipe 5 for utilization. 14 | Gas regulator valve 75 is utilized to reduce the pressur 15 level inside hydrogen generator 10. The pressure differential 16 hydrogen gas output to gas mixing chamber 40 is, for example, 17 i 30 lbs. to 15 lbs. Once hydrogen generator 10 reaches an op- 18 t timum gas pressure level, pressure switch 29 shuts off elec-