(39)
(39)
Where it is first named
Water condensing unit (40) of Figure (39) is placed over said Dome Assembly (10/30).
How it is written
- (39) 1×
Drawings 3
-
Water condensing unit (40) of Figure (39) is placed over said Dome Assembly (10/30). · Catalytic Block Assembly
-
Carries this number · Catalytic Block Assembly
-
Flame projection is achievable beyond six inches while flame temperature is variable up to and beyond 5,000 degrees F. · Catalytic Block Assembly